Folkestonomy


All working - keep mapping


Thanks to very smooth procedures (BIG THANK YOU to Dorian, John and MArtin) and no unforeseen difficulties, the float computer was back on the float and cabled up to the collector box this morning. Just in time for the guided tour visit.
All mappings from the previous week will be uploaded today, so if you have done a mapping between the 17th and 29th of August, your entry will be logged on the 1st or 2nd of September.
Photos to follow soon.

topics:

a public works project. site design and build by dorian